CRA SRP · versioned source mirror

Guidance changelog

What this readiness sample is pinned to, and what must be re-checked at launch.

Source re-checked 11 September 2026 · corpus 2026-09-11.1

Primary Commission and ENISA guidance was re-checked on the reporting start date. The sample remains non-authoritative and intentionally exposes unresolved guidance conflicts instead of guessing.

What this version covers

2026-09-11.1 is a dated reading, not a claim that guidance is frozen. It records seven primary pages checked on 11 September: the Commission reporting page and implementation-guidance notice; ENISA's SRP landing page and FAQ; and ENISA guidance for Assigned Representative registration, notification submission/update, and interface functions.

Use the date to judge freshness, then open the publisher-maintained sources below before acting. This page does not mirror their full text, validate a filing, or resolve conflicts between guidance pages.

Tracked changes

11 September 2026

Primary Commission and ENISA pages were re-checked on the date CRA reporting obligations entered into application. The published reporting clocks and single-entry platform description remain represented as source-linked preparation aids; no ENISA schema or submission workflow is claimed. Commission reporting source ↗ · ENISA FAQ ↗.

31 August 2026

ENISA FAQ re-dated/updated. Current source: ENISA FAQ ↗.

14 August 2026

Assigned Representative interface-guide material reported a 10-manufacturer cap for an unverified representative; FAQ material states 20. The readiness sample flags the discrepancy rather than choosing one. interface-guide summary ↗.

11–12 September 2026 · scheduled re-check

After the SRP launch, re-check the live platform and ENISA guidance, diff against this dated corpus, and update the sample before treating it as current.

← Back to CRA SRP Readiness


Back to top ↑
Rodion · rodion.place · Contact · RSS · Source